KIRKOP – Situated on the second floor, this two-bedroom apartment offers a warm and welcoming layout. Upon entry, one is greeted by a short corridor leading to an open-plan kitchen, dining, and living area, a guest bathroom, and a front terrace. Attached to the open-plan area, one will also find two double bedrooms, both leading to an outdoor and the main bedroom is also equipped with an en suite.
Nestled in the heart of the village, this brand-new, smart development is set to commence construction in January 2026, with completion estimated for December 2027. All units are being offered fully finished, including bathrooms and doors, and come with interconnected optional garages available at an additional cost.


